Yahoo España Búsqueda web

Search results

  1. 15 de feb. de 2023 · The Academy will break ground on a 30,000-square-foot facility for music education and performance, thanks to a $24 million gift from Board President Amy Falls and her husband Hartley Rogers. The center will be the first purpose-built structure for music at Andover and part of a new cultural corridor on campus.

    • Music - Andover

      new music building. 10 . large performance ensembles. ......

  2. 8 de dic. de 2022 · The school's first purpose-built center for music education and performance will open in fall 2024, thanks to generous donors and alumni. The 30,000-square-foot facility will feature a 250-seat hall, a recording studio, a court, and more.

  3. 15 de feb. de 2023 · The 30,000-square-foot center, expected to open in the fall of 2024, will be named for Amy Falls, president of the Board of Trustees. The facility will feature a 250-seat performance hall, flexible ensemble spaces and classrooms, and a rock room with recording and broadcast capabilities.

  4. 15 de sept. de 2022 · Andover is building a new music facility that will replace Graves Hall and offer more space, technology, and opportunities for music students. The new building will be located on Phillips Street and will be part of Andover's cultural corridor.

  5. 21 de sept. de 2021 · Phillips Academy. ·. September 21, 2021 ·. Strike up the band! Plans for a new music building at #Andover are hitting all the right notes, with space for performance and practice, an electronic music studio, technology labs, classrooms, and more.

  6. 30 de ago. de 2022 · Phillips Academy. · August 30, 2022 ·. A classroom for William Thomas. Together, we will dedicate a learning space in #Andover ’s future music building in memory of the towering leader—who transformed the landscape of music education and taught generations of students at #PhillipsAcademy.