Yahoo España Búsqueda web

Search results

  1. Hace 1 día · He mentioned Tom Kim making bogey in the playoff at the Travelers. Scheffler made a 5-foot par putt on the 18th to win the Memorial, and a putt from about that range for his gold medal. His rally at The Players Championship included a wedge he holed out for eagle. He also recalls Sam Burns making a 40-footer to beat him at Colonial in 2023.

  2. Hace 3 días · Notes & Notables. Playing in Threes – Players were sent in threesomes for the Final Round, with competitors going off both the front and back nines.; Toughest Hole – Over two days of play at Salem Country Club, the ninth hole played as the most difficult. It didn’t surrender a single birdie during the Championship, while dishing out 81 bogeys and 29 double bogey or worse.

  3. Hace 1 día · HUNTINGDON VALLEY, Pa. — Rick and Vinny Alessi won the 113 th Parent/Child – Older at a rainy Philmont Country Club (par 70, 6,121 yards) in a scorecard playoff Thursday. The Alessi team tied Jim and Matt Krass of Radley Run Country Club at 3-over-par 73. However, it posted an even-par 35 on Philmont’s back nine.

  4. Hace 4 días · Doors open 1.5 hours prior to show start time. OLG Stage at Fallsview Casino can be entered through the left side of the Galleria walkway in Fallsview Casino Resort. Access across the covered bridge directly into the venue or from Murray St./Stanley Ave intersection at street level.

  5. Hace 6 días · Singh was playing at Spyglass and carded a 4-under 68, recording five birdies against one bogey – at the par-4 16th. Doug Barron (65 on Saturday) and Paul Goydos (71) are tied for third, six ...

  6. 8 de jun. de 2024 · It was shocking to see Scheffler blade a greenside bunker shot into the water on the par-5 fifth hole on Saturday at Muirfield Village and make bogey.

  7. Hace 2 días · Ohio One Chip Plant Project overview. Intel announced on January 21, 2022, that they have chosen the New Albany International Business Parks in Licking County as the site for a chip manufacturing project. This project will involve the construction of two factories and is estimated to cost over $20 billion.